35. |
All individual sewage treatment facilities are prohibited
except during such time as on-tap sewer service
approved by the Developer and permitted in the subdivision
by the Developer at rates reasonably comparable
to surrounding systems is unavailable. Septic or
sewer systems installed according to this exception
must meet the guidelines established by all relevant
agencies. Upon availability of system sewer service
approved by the Developer and permitted in the subdivision
by the Developer at rates reasonably comparable
to surrounding systems, each lot owner possessing
an individual system pursuant to the above exception
will have a period of 3 years to connect up to such
system and remove or permanently disconnect any
on-lot septic tanks or facilities. |
36. |
All
individual water supply systems installed must meet
the guidelines established by all relevant agencies.
All pumps etc. must be suitably housed in a structure
approved by the Developer. Upon availability of
on-tap water service approved by the Developer and
permitted in the subdivision by the Developer at
rates reasonably comparable to surrounding systems,
each lot owner will have a period of 3 years to
connect up to such system. Pumps and wells are permitted
even though lot owners are required to connect to
the water system. |
37. |
All
wired utilities are to be provided to each lot in
underground conduit. All structures connecting to
such utilities shall be connected with underground
conduit installed from the structure to the entrance
conduit. All utility services must be underground.
A location diagram of all installed utilities shall
be provided to the Developer. |
38
. |
Easements
for installation and maintenance of utilities and
drainage are reserved as specified on the plats
or on all right-of-ways and common areas. |